
敞口种植袋 · 水洗低EC
敞口椰糠板,经淡水清洗以降低 EC。宽开口,便于顶部滴灌和根区检查。
经淡水清洗以降低 EC。宽开口适用于顶部滴灌和直接根系检查。专为长季节作物设计,包括辣椒、茄子和草莓,适用于排废系统。
敞口
宽开口
低 EC
水洗处理
已检测
每批产品
技术规格
敞口设计,实现精准排废。
经淡水清洗以降低 EC。宽开口,适用于顶部滴灌系统和直接根系检查。每批均经检测。
| Parameter | Value |
|---|---|
| Format | Open-top slab |
| Material | Coir pith |
| Washing | Fresh water, to reduce EC |
| Chemicals | None — not buffered |
| Testing | Every batch, before it ships |
作物指南
适用于辣椒、茄子和浆果。
Target EC, drain percentage, and dripper configuration for the three crops this slab is engineered for.

Capsicum & Sweet Pepper
EC target
2.0 – 3.5 in-slab
Drain %
20 – 30%
Configuration
2 drippers/plant; slight generative stress in fruiting phase improves Brix

Aubergine / Eggplant
EC target
2.0 – 3.0 in-slab
Drain %
15 – 25%
Configuration
Long-season crop; flush slab mid-season if EC rises above 4.0

Strawberry
EC target
1.2 – 2.0 in-slab
Drain %
25 – 40%
Configuration
High drain; wide opening allows easy runner removal and root inspection
Drainage Setup Protocol
Pre-saturate. Set drain. Close clean.
Correct slab preparation and drain geometry make the difference between consistent drain percentage and pooling.
01
Pre-saturate
Flood slabs before planting and let them drain. Check the drain EC before introducing nutrients.
02
Drain Holes
Cut a few small slits at the slab ends on the bottom face. Angle slabs slightly toward the drain to prevent pooling. Cut after pre-saturation only.
03
Season End
Flush with clean water at season end. Spent slab is peat-free and suitable for soil amendment or composting.
质量
每批发货前均经检测。
向我们索取最新批次的检测结果。
Every batch tested before dispatch
Every batch is tested before it ships, and checked against your specification.
相关产品



