
Open-Top Grow Bags · 20 L · Pre-buffered
Open-top coir slab, 20 L. Pre-buffered to EC 0.5–1.2 mS/cm. 15–20 cm opening for top-feed drippers and root-zone inspection.
Pre-buffered to EC 0.5–1.2 mS/cm. Opening width 15–20 cm, suitable for top-feed drippers and direct root inspection. Designed for long-season crops including capsicum, aubergine, and strawberry in drain-to-waste systems.
28%
Air porosity
20 cm
Opening width
< 1.2
EC buffered
Technical Specifications
Open-top design for precision drain-to-waste.
Pre-buffered to EC 0.5–1.2. Wide opening for top-feed systems and direct root access. COA with every batch.
| Parameter | Value | Unit |
|---|---|---|
| Electrical Conductivity | 0.5 – 1.2 | mS/cm |
| pH | 5.5 – 6.5 | — |
| Volume per slab | 20 | litres |
| Water Retention | 55 – 65 | % |
| Air Porosity | 28 | % |
| Opening Width | 15 – 20 | cm |
| Particle Size | 0 – 8 | mm |
| Moisture Content | < 20 | % |
Crop Guide
Suited for capsicum, aubergine, and berries.
Target EC, drain percentage, and dripper configuration for the three crops this slab is engineered for.

Capsicum & Sweet Pepper
EC target
2.0 – 3.5 in-slab
Drain %
20 – 30%
Configuration
2 drippers/plant; slight generative stress in fruiting phase improves Brix

Aubergine / Eggplant
EC target
2.0 – 3.0 in-slab
Drain %
15 – 25%
Configuration
Long-season crop — flush slab mid-season if EC rises above 4.0

Strawberry
EC target
1.2 – 2.0 in-slab
Drain %
25 – 40%
Configuration
High drain; wide opening allows easy runner removal and root inspection
Drainage Setup Protocol
Pre-saturate. Set drain. Close clean.
Correct slab preparation and drain geometry make the difference between consistent drain percentage and pooling.
01
Pre-saturate
Flood slabs 24 h before planting. Drain to 20–30% of slab volume. Check EC — target < 1.5 mS/cm before introducing nutrients.
02
Drain Holes
Cut 2–3 slits (10 mm) at slab ends on the bottom face. Angle slabs 1–2° toward drain to prevent pooling. Cut after pre-saturation only.
03
Season End
Flush with EC ≤ 0.5 water for 48 h. Spent slab is peat-free and suitable for soil amendment or composting.
Certificate of Analysis
COA on every batch, before dispatch.
Request the current batch COA or download sample documentation.
Certificate of Analysis — every batch
EC, pH, moisture, and biological contamination — lab-verified before dispatch.
Related Products


